Product configuration sheet
KernsOptic configuration fields and assembly requirements.
Fiber assemblies · Product presentation
Patch cords & pigtails
Fiber assemblies connect optical equipment with defined fiber paths, end interfaces and lengths. Patch cords are terminated at both ends; pigtails provide a connector at one end and a fiber tail for splicing at the other.
Inquiry choices · custom configurations by drawing
| Assembly | End A / End B | Fiber selection | Length selection | Inquiry |
|---|---|---|---|---|
| Patch cord | LC / LC | Singlemode or multimode | 1 / 2 / 3 m or drawing | Inquire |
| Hybrid patch cord | LC / SC | Singlemode or multimode | 1 / 2 / 3 m or drawing | Inquire |
| Patch cord | SC / SC | Singlemode or multimode | 1 / 2 / 3 m or drawing | Inquire |
| Pigtail | LC / bare fiber | Singlemode or multimode | Defined splice-tail length | Inquire |
| Pigtail | SC / bare fiber | Singlemode or multimode | Defined splice-tail length | Inquire |
| PM patch cord | FC / LC / SC as specified | PM fiber at the selected wavelength | Defined optical path | Inquire |
| Parameter | Configuration |
|---|---|
| Optical path | Point-to-point patch cord or splice pigtail |
| Fiber category | OS2 / OM3 / OM4 or wavelength-specific PM |
| Polish | UPC / APC, identified separately for each end |
| Jacket and buffer | Matched to the fiber and termination |
| Length | Reference points and tolerance on the drawing |
| Optical acceptance | Loss, return loss and PM axis where applicable |
PM patch-cord specifications are provided separately for the selected PM assembly.
Yes. A hybrid patch cord is identified by each end independently, including connector family and polish.
Operating wavelength, fiber type and connector key-to-axis alignment are part of the PM configuration. The ordinary multimode reference does not define them.
KernsOptic product configuration information
KernsOptic configuration fields and assembly requirements.
Existing wavelength-specific PM product datasheet.
Reference values pending Kanghao engineering confirmation. Technical comparison data; final build ratings require a confirmed specification.
Reference values pending Kanghao engineering confirmation. Technical comparison data; final build ratings require a confirmed specification.
Your configuration
A drawing, configuration or part reference is enough to start. Custom production is normally 4–10 weeks; samples and pilot quantities are quoted.